Argonne Site Office CX Determinations
Determination Date | Name of Action: Description | Categorical Exclusion Number |
---|---|---|
9/24/2014 | ASO-CX-306 Building 440 CNM Clean Room Expansion | B3.15 |
9/24/2014 | ASO-CX-309 Bio-Aviation Fuel LCA with GREET | B5.15 |
9/24/2014 | ASO-CX-308 Nationwide AFV Emergency Responder, Recovery, Reconstruction & Investigation | B5.15 |
9/24/2014 | ASO-CX-307 Methods to Measure, Predict, and Relate Friction. Wear, and Fuel Economy | B3.6 |
6/6/2014 | ASO-CX-305 Sawmill Creek Stream Bank Erosion | B1.3 |
6/6/2014 | ASO-CX-304 U. S. Department of Agriculture Forest Service-Slow the Spread of Gypsy Moth | B1.3 |
5/7/2014 | ASO-CX-302 Emerald Ash Borer Control | B1.3 |
5/7/2014 | ASO-CX-303 Microbial Laboratory Analysis | B3.15 |
12/12/2013 | ASO-CX-300 Operation of the 50 MeV Electron LINAC Accelerator | B3.10 |
8/9/2013 | ASO-CX-298 Bio Safety Level-1 and Bio Safety level-2 Research at Argonne ASO-CX-298 | B3:6 |