Argonne Site Office CX Determinations

Determination Date Name of Action: Description Categorical Exclusion Number
1/24/2011 ASO-CX-277 Midwest Photovoltaics Analysis Facility at the Tollway B3.6
1/25/2011 ASO-CX-279 Generic Categorical Exclusion: Environment Characterization and Monitoring B3.1
9/2/2010 ASO-CX-272 Removal of Building 370 FELIX Magnet B3.6
10/1/2010 ASO-CX-273 NOvA Neutrino Experiment Construction Project B3.6; B3.8
11/3/2010 ASO-CX-274 Ultra Fast Boriding for Improved Efficiency B3.6
12/1/2010 ASO-CX-275 Superconducting Cavity Surface Processing Facility B3.6
4/6/2010 ASO-CX-267 Enhanced Energy Storage Facilities to Support Expanding DOE Program B3.6
6/10/2010 ASO-CX-268 Biomass Production and Nitrogen Recovery in 21st Century Riparian Buffers B3.1(j)
8/20/2010 ASO-CX-270 Construction and Operation of Material Engineering Facility B3.6
9/1/2010 ASO-CX-271 Demolition and Recycling of the SIX Tesla Superconducting Dipole Magnet System B3.6