Categorical Exclusion (CX) Determinations
Argonne Site Office Categorical Exclusion (CX) Determinations
Determination Date | Name of Action: Description | Categorical Exclusion Number |
---|---|---|
1/24/2011 | ASO-CX-277 Midwest Photovoltaics Analysis Facility at the Tollway | B3.6 |
1/25/2011 | ASO-CX-279 Generic Categorical Exclusion: Environment Characterization and Monitoring | B3.1 |
9/2/2010 | ASO-CX-272 Removal of Building 370 FELIX Magnet | B3.6 |
10/1/2010 | ASO-CX-273 NOvA Neutrino Experiment Construction Project | B3.6; B3.8 |
11/3/2010 | ASO-CX-274 Ultra Fast Boriding for Improved Efficiency | B3.6 |
12/1/2010 | ASO-CX-275 Superconducting Cavity Surface Processing Facility | B3.6 |
4/6/2010 | ASO-CX-267 Enhanced Energy Storage Facilities to Support Expanding DOE Program | B3.6 |
6/10/2010 | ASO-CX-268 Biomass Production and Nitrogen Recovery in 21st Century Riparian Buffers | B3.1(j) |
8/20/2010 | ASO-CX-270 Construction and Operation of Material Engineering Facility | B3.6 |
9/1/2010 | ASO-CX-271 Demolition and Recycling of the SIX Tesla Superconducting Dipole Magnet System | B3.6 |